Corrosion Surveillance, RMC 1998

During the second year of a corrosion surveillance program, sets CLIMAT coupons were deployed at ten exposure locations, each with three units, at RMC during the winter of 1998 (Jan. 7 to Mar. 7, 1998) as shown in the following Figure.  The RMC campus is located on a small peninsula which extends into one of the Great Lakes, lake Ontario, at the mouth of the St. Lawrence River. 

Each unit was placed about 2 m above the ground except for the set placed on the Sawyer roof (S) and on the pedestrian bridge over the highway (HB). The mass loss results and a plot of the corrosivity by the road are shown here and the seasonal patterns of wind frequency distribution at the nearest airport during 1997 are shown in  pie charts.

Additional corrosivity results

Kingston 1997 results, RMC campus
Kingston 1998 results, RMC campus
Kingston 1999 results, 401 Highway
Kingston 2000 results, corrosion shielding
CFB Esquimalt 
CFB Greenwood